{"id":22,"date":"2016-09-13T13:16:53","date_gmt":"2016-09-13T13:16:53","guid":{"rendered":"http:\/\/localhost\/Themes\/2017\/Vision\/Website_WP\/index.php\/projects\/"},"modified":"2025-10-18T14:01:13","modified_gmt":"2025-10-18T11:01:13","slug":"projects","status":"publish","type":"page","link":"https:\/\/www.spilno.in.ua\/?page_id=22","title":{"rendered":"Projects"},"content":{"rendered":"<div>\n<h1>Our Projects<\/h1>\n<div>\n<p>Selected projects supported by SPILNO showcasing our role in structuring, coordinating, and implementing Ukraine\u2019s leading public investment and PPP initiatives.<\/p>\n<\/div>\n<\/div>\n<h1>01<\/h1>\n<div>\n<h3>Olvia Sea Port<\/h3>\n<p>Project management, stakeholder coordination, legal and financial advisory to the Ministry of Infrastructure and investors<\/p>\n<div>\n<div class=\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\" style=\"gap:6px;\">\n  <span class=\"uk-label uk-label-blue\">Concession<\/span><br \/>\n  <span class=\"uk-label uk-label-blue\">PM<\/span><br \/>\n  <span class=\"uk-label uk-label-warning\">Central Gov.<\/span>\n<\/div>\n<\/div>\n<p><a href=\"\/?page_id=668\">Read more<\/a><\/p>\n<\/div>\n<p><a href=\"\/index.php?page_id=29\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/Complex_4-2.jpg\" alt=\"\"><\/a><\/p>\n<h1>02<\/h1>\n<div>\n<h3>Kherson Sea Commercial Port<\/h3>\n<p>Full-cycle transaction advisory: feasibility, risk assessment, and investor engagement support.<\/p>\n<div>\n<div class=\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\" style=\"gap:6px;\">\n  <span class=\"uk-label uk-label-blue\">Concession<\/span><br \/>\n  <span class=\"uk-label uk-label-blue\">PM<\/span><br \/>\n  <span class=\"uk-label uk-label-warning\">Central Gov.<\/span>\n<\/div>\n<\/div>\n<p><a href=\"\/?page_id=973\">Read more<\/a><\/p>\n<\/div>\n<p><a href=\"\/index.php?page_id=29\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/projects-kscp.jpg\" alt=\"\"><\/a><\/p>\n<h1>03<\/h1>\n<div>\n<h3>Container Terminal at <br \/>Chornomorsk Sea Port<\/h3>\n<p>Coordination of the concession project preparation, including feasibility study, financial modeling, legal due diligence, and coordination with international financial institutions (IFC, EBRD).<\/p>\n<div>\n<div class=\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\" style=\"gap:6px;\">\n  <span class=\"uk-label uk-label-blue\">Concession<\/span><br \/>\n  <span class=\"uk-label uk-label-blue\">PM<\/span><br \/>\n  <span class=\"uk-label uk-label-warning\">Central Gov.<\/span>\n<\/div>\n<\/div>\n<\/div>\n<p><a href=\"\/index.php?page_id=29\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/10-kontejnernyj-terminal-portu-chornomorsk-e1760306409512.jpg\" alt=\"\"><\/a><\/p>\n<h1>04<\/h1>\n<div>\n<h3>Ferry Terminal at <br \/>Chornomorsk Sea Port<\/h3>\n<p>Developing pre-feasibility, coordination of advisers on feasibility stage, and project appraisal support to the Ministry.<\/p>\n<div>\n<div class=\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\" style=\"gap:6px;\">\n  <span class=\"uk-label uk-label-blue\">Concession<\/span><br \/>\n  <span class=\"uk-label uk-label-blue\">PM<\/span><br \/>\n  <span class=\"uk-label uk-label-warning\">Central Gov.<\/span>\n<\/div>\n<\/div>\n<\/div>\n<p><a href=\"\/index.php?page_id=29\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/picturepicture25531_2722.jpg\" alt=\"\"><\/a><\/p>\n<h1>05<\/h1>\n<div>\n<h3>Ukraine Regional Airports<\/h3>\n<p>Support to the Ministry of Infrastructure in developing PPP concepts and pre-feasibility studies for regional airports to attract private operators and investors.<\/p>\n<div>\n<div class=\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\" style=\"gap:6px;\">\n  <span class=\"uk-label uk-label-blue\">Concession<\/span><br \/>\n  <span class=\"uk-label uk-label-blue\">PM<\/span><br \/>\n  <span class=\"uk-label uk-label-warning\">Central Gov.<\/span>\n<\/div>\n<\/div>\n<\/div>\n<p><a href=\"\/index.php?page_id=29\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/Image-from-wp-s.ru-1.jpg\" alt=\"\"><\/a><\/p>\n<h1>06<\/h1>\n<div>\n<h3>Ukraine National Roads Program<\/h3>\n<p>Coordination of the research on options for involving the private sector in road upgrade, maintenance, and operation under PPP and concession frameworks.<\/p>\n<div>\n<div class=\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\" style=\"gap: 6px;\"><span class=\"uk-label uk-label-primary\">PPP<\/span> <span class=\"uk-label uk-label-blue\">PM<\/span> <span class=\"uk-label uk-label-warning\">Central Gov.<\/span><\/div>\n<\/div>\n<\/div>\n<p><a href=\"\/index.php?page_id=29\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/original.jpg\" alt=\"\"><\/a><\/p>\n<h1>07<\/h1>\n<div>\n<h3>PPP &#038; Concession <br \/>Legislation Drafting<\/h3>\n<p>Legal drafting, institutional framework design, and regulatory alignment with EU and IFI standards.<\/p>\n<div>\n<div class=\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\" style=\"gap:6px;\">\n  <span class=\"uk-label uk-label-violet\">Policy<\/span><br \/>\n  <span class=\"uk-label uk-label-violet\">Legal<\/span><br \/>\n  <span class=\"uk-label uk-label-warning\">Central Gov.<\/span>\n<\/div>\n<\/div>\n<\/div>\n<p><a href=\"\/index.php?page_id=29\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/pexels-ketut-subiyanto-4963437.jpg\" alt=\"\"><\/a><\/p>\n<h1>08<\/h1>\n<div>\n<h3>Secondary Legislation for <br \/> Investment Incentives <\/h3>\n<p>Advisory support to the Ministry of Economy in drafting and revising bylaws regulating investor support mechanisms (\u201cInvestment Nanny\u201d law).<\/p>\n<div>\n<div class=\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\" style=\"gap:6px;\">\n  <span class=\"uk-label uk-label-violet\">Policy<\/span><br \/>\n  <span class=\"uk-label uk-label-violet\">Legal<\/span><br \/>\n  <span class=\"uk-label uk-label-warning\">Central Gov.<\/span>\n<\/div>\n<\/div>\n<\/div>\n<p><a href=\"\/index.php?page_id=29\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/Manhattan-background-2.jpg\" alt=\"\"><\/a><\/p>\n<h1>09<\/h1>\n<div>\n<h3>Public Investment Management (PIM) Reform<\/h3>\n<p>Development of a unified methodology for public investment project preparation, appraisal, prioritization and funding allocation.<\/p>\n<div>\n<div class=\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\" style=\"gap:6px;\">\n  <span class=\"uk-label uk-label-violet\">Policy<\/span><br \/>\n  <span class=\"uk-label uk-label-violet\">Legal<\/span><br \/>\n  <span class=\"uk-label uk-label-warning\">Central Gov.<\/span>\n<\/div>\n<\/div>\n<\/div>\n<p><a href=\"\/index.php?page_id=29\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/video_thumb_en.png\" alt=\"\"><\/a><\/p>\n<h1>10<\/h1>\n<div>\n<h3>Traffic Violation Cameras<\/h3>\n<p>Design of a PPP mechanism for automatic traffic enforcement, including financial modeling and budget impact assessment.<\/p>\n<div>\n<div class=\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\" style=\"gap:6px;\">\n  <span class=\"uk-label uk-label-primary\">PPP<\/span><br \/>\n  <span class=\"uk-label uk-label-warning\">Financial<\/span><br \/>\n  <span class=\"uk-label uk-label-darkblue\">Private<\/span>\n<\/div>\n<\/div>\n<\/div>\n<p><a href=\"\/index.php?page_id=29\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/Speed-Enforcement-Cameras-The-Different-Types-and-Uses-of-Cameras-Explained-5-1.jpg-%D0%BA%D0%BE%D0%BF%D1%96%D1%8F.jpg\" alt=\"\"><\/a><\/p>\n<h1>11<\/h1>\n<div>\n<h3>Dolyna Municipal Heating Improvement<\/h3>\n<p>Development of a PPP structure, feasibility study and financial model, as well as full package of tender documentation for modernization of the district heating system in Dolyna community.<\/p>\n<div>\n<div class=\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\" style=\"gap:6px;\">\n  <span class=\"uk-label uk-label-primary\">PPP<\/span><br \/>\n  <span class=\"uk-label uk-label-blue\">PM<\/span><br \/>\n  <span class=\"uk-label uk-label-light\">Municipal<\/span>\n<\/div>\n<\/div>\n<\/div>\n<p><a href=\"\/index.php?page_id=29\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/img_20230124_091349.jpg\" alt=\"\"><\/a><\/p>\n<h1>12<\/h1>\n<div>\n<h3>Truskavets Minimally Invasive Surgery Center<\/h3>\n<p>Full-cycle PPP preparation, including concept note, feasibility study, financial model, and tender documentation for project implementation.<\/p>\n<div>\n<div class=\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\" style=\"gap:6px;\">\n  <span class=\"uk-label uk-label-blue\n\">Concession<\/span><br \/>\n  <span class=\"uk-label uk-label-blue\">PM<\/span><br \/>\n  <span class=\"uk-label uk-label-light\">Municipal<\/span>\n<\/div>\n<\/div>\n<\/div>\n<p><a href=\"\/index.php?page_id=29\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/ritu-chauhan-P9w9U_VyshQ-unsplash.jpg\" alt=\"\"><\/a><\/p>\n<h1>13<\/h1>\n<div>\n<h3>Trostyanets Municipal Park Reconstruction<\/h3>\n<p>Comprehensive PPP advisory covering concept design, feasibility study, and tender preparation for urban park revitalization.<\/p>\n<div>\n<div class=\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\" style=\"gap:6px;\">\n  <span class=\"uk-label uk-label-blue\n\">Concession<\/span><br \/>\n  <span class=\"uk-label uk-label-blue\">PM<\/span><br \/>\n  <span class=\"uk-label uk-label-light\">Municipal<\/span>\n<\/div>\n<\/div>\n<\/div>\n<p><a href=\"\/index.php?page_id=29\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/ignacio-brosa-vJDbPuxUS_s-unsplash.jpg\" alt=\"\"><\/a><\/p>\n<h1>14<\/h1>\n<div>\n<h3>Zhytomyr Municipal Laundry Service<\/h3>\n<p>Full-cycle PPP advisory, including concept development, feasibility study, financial modeling, and preparation of tender documentation for municipal service modernization.<\/p>\n<div>\n<div class=\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\" style=\"gap:6px;\">\n  <span class=\"uk-label uk-label-primary\n\">PPP<\/span><br \/>\n  <span class=\"uk-label uk-label-blue\">PM<\/span><br \/>\n  <span class=\"uk-label uk-label-light\">Municipal<\/span>\n<\/div>\n<\/div>\n<\/div>\n<p><a href=\"\/index.php?page_id=29\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/oli-woodman-f4jsI88K7ds-unsplash.jpg\" alt=\"\"><\/a><\/p>\n<p><!--more--><br \/>\n<!-- {\"name\":\"Services\",\"type\":\"layout\",\"children\":[{\"name\":\"Hero\",\"type\":\"section\",\"props\":{\"height\":\"section\",\"height_offset_top\":true,\"image_position\":\"center-center\",\"image_size\":\"cover\",\"media_background\":\"rgba(55, 82, 170, 0.9)\",\"media_blend_mode\":\"multiply\",\"media_overlay\":\"rgba(30, 54, 132, 0.7)\",\"padding\":\"xlarge\",\"style\":\"default\",\"text_color\":\"light\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"video\":\"wp-content\\\/uploads\\\/projects-hero-video.mp4\",\"width\":\"large\"},\"children\":[{\"type\":\"row\",\"props\":{\"column_gap\":\"small\",\"layout\":\"1-2,1-2\",\"row_gap\":\"small\",\"width\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-2\"},\"children\":[{\"type\":\"panel\",\"props\":{\"content\":\"\n\n<p>Selected projects supported by SPILNO showcasing our role in structuring, coordinating, and implementing Ukraine\\u2019s leading public investment and PPP initiatives.<\\\/p>\",\"content_column_breakpoint\":\"m\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link_style\":\"default\",\"link_text\":\"Read more\",\"margin\":\"medium\",\"maxwidth\":\"large\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"text-meta\",\"title\":\"Our Projects\",\"title_align\":\"top\",\"title_element\":\"h1\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-2\"}}]}]},{\"name\":\"Projects\",\"type\":\"section\",\"props\":{\"animation\":\"slide-top-small\",\"animation_delay\":false,\"image_position\":\"center-center\",\"padding\":\"large\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"\",\"width\":\"large\"},\"children\":[{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"margin\":\"large\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"block_align\":\"center\",\"content\":\"01\",\"margin\":\"remove-vertical\",\"margin_remove_bottom\":false,\"maxwidth\":\"large\",\"title_color\":\"muted\",\"title_element\":\"h1\",\"title_style\":\"heading-large\"}},{\"type\":\"panel\",\"props\":{\"block_align\":\"center\",\"content\":\"\n\n<div class=\\\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\\\" style=\\\"gap:6px;\\\">\\n  <span class=\\\"uk-label uk-label-blue\\\">Concession<\\\/span>\\n  <span class=\\\"uk-label uk-label-blue\\\">PM<\\\/span>\\n  <span class=\\\"uk-label uk-label-warning\\\">Central Gov.<\\\/span>\\n<\\\/div>\",\"content_column_breakpoint\":\"m\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link\":\"?page_id=668\",\"link_style\":\"\",\"link_text\":\"Read more\",\"margin\":\"small\",\"maxwidth\":\"large\",\"meta\":\"Project management, stakeholder coordination, legal and financial advisory to the Ministry of Infrastructure and investors\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"\",\"text_align\":\"left\",\"title\":\"Olvia Sea Port\",\"title_align\":\"top\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\\\/uploads\\\/Complex_4-2.jpg\",\"image_svg_color\":\"emphasis\",\"image_width\":\"920\",\"link\":\"index.php?page_id=29\",\"margin\":\"default\"}}]}]},{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"margin\":\"large\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"block_align\":\"center\",\"content\":\"02\",\"margin\":\"remove-vertical\",\"margin_remove_bottom\":false,\"maxwidth\":\"large\",\"title_color\":\"muted\",\"title_element\":\"h1\",\"title_style\":\"heading-large\"}},{\"type\":\"panel\",\"props\":{\"block_align\":\"center\",\"content\":\"\n\n<div class=\\\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\\\" style=\\\"gap:6px;\\\">\\n  <span class=\\\"uk-label uk-label-blue\\\">Concession<\\\/span>\\n  <span class=\\\"uk-label uk-label-blue\\\">PM<\\\/span>\\n  <span class=\\\"uk-label uk-label-warning\\\">Central Gov.<\\\/span>\\n<\\\/div>\",\"content_column_breakpoint\":\"m\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link\":\"?page_id=973\",\"link_style\":\"\",\"link_text\":\"Read more\",\"margin\":\"small\",\"maxwidth\":\"large\",\"meta\":\"Full-cycle transaction advisory: feasibility, risk assessment, and investor engagement support.\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"\",\"text_align\":\"left\",\"title\":\"Kherson Sea Commercial Port\",\"title_align\":\"top\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\\\/uploads\\\/projects-kscp.jpg\",\"image_svg_color\":\"emphasis\",\"image_width\":\"920\",\"link\":\"index.php?page_id=29\",\"margin\":\"default\"}}]}]},{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"margin\":\"large\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"block_align\":\"center\",\"content\":\"03\",\"margin\":\"remove-vertical\",\"margin_remove_bottom\":false,\"maxwidth\":\"large\",\"title_color\":\"muted\",\"title_element\":\"h1\",\"title_style\":\"heading-large\"}},{\"type\":\"panel\",\"props\":{\"block_align\":\"center\",\"content\":\"\n\n<div class=\\\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\\\" style=\\\"gap:6px;\\\">\\n  <span class=\\\"uk-label uk-label-blue\\\">Concession<\\\/span>\\n  <span class=\\\"uk-label uk-label-blue\\\">PM<\\\/span>\\n  <span class=\\\"uk-label uk-label-warning\\\">Central Gov.<\\\/span>\\n<\\\/div>\",\"content_column_breakpoint\":\"m\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link_style\":\"\",\"link_text\":\"Read more\",\"margin\":\"small\",\"maxwidth\":\"large\",\"meta\":\"Coordination of the concession project preparation, including feasibility study, financial modeling, legal due diligence, and coordination with international financial institutions (IFC, EBRD).\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"\",\"text_align\":\"left\",\"title\":\"Container Terminal at <br \/>Chornomorsk Sea Port\",\"title_align\":\"top\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\\\/uploads\\\/10-kontejnernyj-terminal-portu-chornomorsk-e1760306409512.jpg\",\"image_svg_color\":\"emphasis\",\"image_width\":\"920\",\"link\":\"index.php?page_id=29\",\"margin\":\"default\"}}]}]},{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"margin\":\"large\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"block_align\":\"center\",\"content\":\"04\",\"margin\":\"remove-vertical\",\"margin_remove_bottom\":false,\"maxwidth\":\"large\",\"title_color\":\"muted\",\"title_element\":\"h1\",\"title_style\":\"heading-large\"}},{\"type\":\"panel\",\"props\":{\"block_align\":\"center\",\"content\":\"\n\n<div class=\\\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\\\" style=\\\"gap:6px;\\\">\\n  <span class=\\\"uk-label uk-label-blue\\\">Concession<\\\/span>\\n  <span class=\\\"uk-label uk-label-blue\\\">PM<\\\/span>\\n  <span class=\\\"uk-label uk-label-warning\\\">Central Gov.<\\\/span>\\n<\\\/div>\",\"content_column_breakpoint\":\"m\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link_style\":\"\",\"link_text\":\"Read more\",\"margin\":\"small\",\"maxwidth\":\"large\",\"meta\":\"Developing pre-feasibility, coordination of advisers on feasibility stage, and project appraisal support to the Ministry.\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"\",\"text_align\":\"left\",\"title\":\"Ferry Terminal at <br \/>Chornomorsk Sea Port\",\"title_align\":\"top\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\\\/uploads\\\/picturepicture25531_2722.jpg\",\"image_svg_color\":\"emphasis\",\"image_width\":\"920\",\"link\":\"index.php?page_id=29\",\"margin\":\"default\"}}]}]},{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"margin\":\"large\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"block_align\":\"center\",\"content\":\"05\",\"margin\":\"remove-vertical\",\"margin_remove_bottom\":false,\"maxwidth\":\"large\",\"title_color\":\"muted\",\"title_element\":\"h1\",\"title_style\":\"heading-large\"}},{\"type\":\"panel\",\"props\":{\"block_align\":\"center\",\"content\":\"\n\n<div class=\\\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\\\" style=\\\"gap:6px;\\\">\\n  <span class=\\\"uk-label uk-label-blue\\\">Concession<\\\/span>\\n  <span class=\\\"uk-label uk-label-blue\\\">PM<\\\/span>\\n  <span class=\\\"uk-label uk-label-warning\\\">Central Gov.<\\\/span>\\n<\\\/div>\",\"content_column_breakpoint\":\"m\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link_style\":\"\",\"link_text\":\"Read more\",\"margin\":\"small\",\"maxwidth\":\"large\",\"meta\":\"Support to the Ministry of Infrastructure in developing PPP concepts and pre-feasibility studies for regional airports to attract private operators and investors.\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"\",\"text_align\":\"left\",\"title\":\"Ukraine Regional Airports\",\"title_align\":\"top\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\\\/uploads\\\/Image-from-wp-s.ru-1.jpg\",\"image_svg_color\":\"emphasis\",\"image_width\":\"920\",\"link\":\"index.php?page_id=29\",\"margin\":\"default\"}}]}]},{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"margin\":\"large\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"block_align\":\"center\",\"content\":\"06\",\"margin\":\"remove-vertical\",\"margin_remove_bottom\":false,\"maxwidth\":\"large\",\"title_color\":\"muted\",\"title_element\":\"h1\",\"title_style\":\"heading-large\"}},{\"type\":\"panel\",\"props\":{\"block_align\":\"center\",\"content\":\"\n\n<div class=\\\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\\\" style=\\\"gap: 6px;\\\"><span class=\\\"uk-label uk-label-primary\\\">PPP<\\\/span> <span class=\\\"uk-label uk-label-blue\\\">PM<\\\/span> <span class=\\\"uk-label uk-label-warning\\\">Central Gov.<\\\/span><\\\/div>\",\"content_column_breakpoint\":\"m\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link_style\":\"\",\"link_text\":\"Read more\",\"margin\":\"small\",\"maxwidth\":\"large\",\"meta\":\"Coordination of the research on options for involving the private sector in road upgrade, maintenance, and operation under PPP and concession frameworks.\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"\",\"text_align\":\"left\",\"title\":\"Ukraine National Roads Program\",\"title_align\":\"top\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\\\/uploads\\\/original.jpg\",\"image_svg_color\":\"emphasis\",\"image_width\":\"920\",\"link\":\"index.php?page_id=29\",\"margin\":\"default\"}}]}]},{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"margin\":\"large\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"block_align\":\"center\",\"content\":\"07\",\"margin\":\"remove-vertical\",\"margin_remove_bottom\":false,\"maxwidth\":\"large\",\"title_color\":\"muted\",\"title_element\":\"h1\",\"title_style\":\"heading-large\"}},{\"type\":\"panel\",\"props\":{\"block_align\":\"center\",\"content\":\"\n\n<div class=\\\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\\\" style=\\\"gap:6px;\\\">\\n  <span class=\\\"uk-label uk-label-violet\\\">Policy<\\\/span>\\n  <span class=\\\"uk-label uk-label-violet\\\">Legal<\\\/span>\\n  <span class=\\\"uk-label uk-label-warning\\\">Central Gov.<\\\/span>\\n<\\\/div>\\n\",\"content_column_breakpoint\":\"m\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link_style\":\"\",\"link_text\":\"Read more\",\"margin\":\"small\",\"maxwidth\":\"large\",\"meta\":\"Legal drafting, institutional framework design, and regulatory alignment with EU and IFI standards.\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"\",\"text_align\":\"left\",\"title\":\"PPP & Concession <br \/>Legislation Drafting\",\"title_align\":\"top\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\\\/uploads\\\/pexels-ketut-subiyanto-4963437.jpg\",\"image_svg_color\":\"emphasis\",\"image_width\":\"920\",\"link\":\"index.php?page_id=29\",\"margin\":\"default\"}}]}]},{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"margin\":\"large\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"block_align\":\"center\",\"content\":\"08\",\"margin\":\"remove-vertical\",\"margin_remove_bottom\":false,\"maxwidth\":\"large\",\"title_color\":\"muted\",\"title_element\":\"h1\",\"title_style\":\"heading-large\"}},{\"type\":\"panel\",\"props\":{\"block_align\":\"center\",\"content\":\"\n\n<div class=\\\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\\\" style=\\\"gap:6px;\\\">\\n  <span class=\\\"uk-label uk-label-violet\\\">Policy<\\\/span>\\n  <span class=\\\"uk-label uk-label-violet\\\">Legal<\\\/span>\\n  <span class=\\\"uk-label uk-label-warning\\\">Central Gov.<\\\/span>\\n<\\\/div>\\n\",\"content_column_breakpoint\":\"m\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link_style\":\"\",\"link_text\":\"Read more\",\"margin\":\"small\",\"maxwidth\":\"large\",\"meta\":\"Advisory support to the Ministry of Economy in drafting and revising bylaws regulating investor support mechanisms (\\u201cInvestment Nanny\\u201d law).\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"\",\"text_align\":\"left\",\"title\":\"Secondary Legislation for <br \/> Investment Incentives \",\"title_align\":\"top\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\\\/uploads\\\/Manhattan-background-2.jpg\",\"image_svg_color\":\"emphasis\",\"image_width\":\"920\",\"link\":\"index.php?page_id=29\",\"margin\":\"default\"}}]}]},{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"margin\":\"large\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"block_align\":\"center\",\"content\":\"09\",\"margin\":\"remove-vertical\",\"margin_remove_bottom\":false,\"maxwidth\":\"large\",\"title_color\":\"muted\",\"title_element\":\"h1\",\"title_style\":\"heading-large\"}},{\"type\":\"panel\",\"props\":{\"block_align\":\"center\",\"content\":\"\n\n<div class=\\\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\\\" style=\\\"gap:6px;\\\">\\n  <span class=\\\"uk-label uk-label-violet\\\">Policy<\\\/span>\\n  <span class=\\\"uk-label uk-label-violet\\\">Legal<\\\/span>\\n  <span class=\\\"uk-label uk-label-warning\\\">Central Gov.<\\\/span>\\n<\\\/div>\\n\",\"content_column_breakpoint\":\"m\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link_style\":\"\",\"link_text\":\"Read more\",\"margin\":\"small\",\"maxwidth\":\"large\",\"meta\":\"Development of a unified methodology for public investment project preparation, appraisal, prioritization and funding allocation.\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"\",\"text_align\":\"left\",\"title\":\"Public Investment Management (PIM) Reform\",\"title_align\":\"top\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\\\/uploads\\\/video_thumb_en.png\",\"image_svg_color\":\"emphasis\",\"image_width\":\"920\",\"link\":\"index.php?page_id=29\",\"margin\":\"default\"}}]}]},{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"margin\":\"large\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"block_align\":\"center\",\"content\":\"10\",\"margin\":\"remove-vertical\",\"margin_remove_bottom\":false,\"maxwidth\":\"large\",\"title_color\":\"muted\",\"title_element\":\"h1\",\"title_style\":\"heading-large\"}},{\"type\":\"panel\",\"props\":{\"block_align\":\"center\",\"content\":\"\n\n<div class=\\\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\\\" style=\\\"gap:6px;\\\">\\n  <span class=\\\"uk-label uk-label-primary\\\">PPP<\\\/span>\\n  <span class=\\\"uk-label uk-label-warning\\\">Financial<\\\/span>\\n  <span class=\\\"uk-label uk-label-darkblue\\\">Private<\\\/span>\\n<\\\/div>\",\"content_column_breakpoint\":\"m\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link_style\":\"\",\"link_text\":\"Read more\",\"margin\":\"small\",\"maxwidth\":\"large\",\"meta\":\"Design of a PPP mechanism for automatic traffic enforcement, including financial modeling and budget impact assessment.\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"\",\"text_align\":\"left\",\"title\":\"Traffic Violation Cameras\",\"title_align\":\"top\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\\\/uploads\\\/Speed-Enforcement-Cameras-The-Different-Types-and-Uses-of-Cameras-Explained-5-1.jpg-\\u043a\\u043e\\u043f\\u0456\\u044f.jpg\",\"image_svg_color\":\"emphasis\",\"image_width\":\"920\",\"link\":\"index.php?page_id=29\",\"margin\":\"default\"}}]}]},{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"margin\":\"large\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"block_align\":\"center\",\"content\":\"11\",\"margin\":\"remove-vertical\",\"margin_remove_bottom\":false,\"maxwidth\":\"large\",\"title_color\":\"muted\",\"title_element\":\"h1\",\"title_style\":\"heading-large\"}},{\"type\":\"panel\",\"props\":{\"block_align\":\"center\",\"content\":\"\n\n<div class=\\\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\\\" style=\\\"gap:6px;\\\">\\n  <span class=\\\"uk-label uk-label-primary\\\">PPP<\\\/span>\\n  <span class=\\\"uk-label uk-label-blue\\\">PM<\\\/span>\\n  <span class=\\\"uk-label uk-label-light\\\">Municipal<\\\/span>\\n<\\\/div>\",\"content_column_breakpoint\":\"m\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link_style\":\"\",\"link_text\":\"Read more\",\"margin\":\"small\",\"maxwidth\":\"large\",\"meta\":\"Development of a PPP structure, feasibility study and financial model, as well as full package of tender documentation for modernization of the district heating system in Dolyna community.\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"\",\"text_align\":\"left\",\"title\":\"Dolyna Municipal Heating Improvement\",\"title_align\":\"top\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\\\/uploads\\\/img_20230124_091349.jpg\",\"image_svg_color\":\"emphasis\",\"image_width\":\"920\",\"link\":\"index.php?page_id=29\",\"margin\":\"default\"}}]}]},{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"margin\":\"large\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"block_align\":\"center\",\"content\":\"12\",\"margin\":\"remove-vertical\",\"margin_remove_bottom\":false,\"maxwidth\":\"large\",\"title_color\":\"muted\",\"title_element\":\"h1\",\"title_style\":\"heading-large\"}},{\"type\":\"panel\",\"props\":{\"block_align\":\"center\",\"content\":\"\n\n<div class=\\\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\\\" style=\\\"gap:6px;\\\">\\n  <span class=\\\"uk-label uk-label-blue\\n\\\">Concession<\\\/span>\\n  <span class=\\\"uk-label uk-label-blue\\\">PM<\\\/span>\\n  <span class=\\\"uk-label uk-label-light\\\">Municipal<\\\/span>\\n<\\\/div>\",\"content_column_breakpoint\":\"m\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link_style\":\"\",\"link_text\":\"Read more\",\"margin\":\"small\",\"maxwidth\":\"large\",\"meta\":\"Full-cycle PPP preparation, including concept note, feasibility study, financial model, and tender documentation for project implementation.\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"\",\"text_align\":\"left\",\"title\":\"Truskavets Minimally Invasive Surgery Center\",\"title_align\":\"top\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\\\/uploads\\\/ritu-chauhan-P9w9U_VyshQ-unsplash.jpg\",\"image_svg_color\":\"emphasis\",\"image_width\":\"920\",\"link\":\"index.php?page_id=29\",\"margin\":\"default\"}}]}]},{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"margin\":\"large\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"block_align\":\"center\",\"content\":\"13\",\"margin\":\"remove-vertical\",\"margin_remove_bottom\":false,\"maxwidth\":\"large\",\"title_color\":\"muted\",\"title_element\":\"h1\",\"title_style\":\"heading-large\"}},{\"type\":\"panel\",\"props\":{\"block_align\":\"center\",\"content\":\"\n\n<div class=\\\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\\\" style=\\\"gap:6px;\\\">\\n  <span class=\\\"uk-label uk-label-blue\\n\\\">Concession<\\\/span>\\n  <span class=\\\"uk-label uk-label-blue\\\">PM<\\\/span>\\n  <span class=\\\"uk-label uk-label-light\\\">Municipal<\\\/span>\\n<\\\/div>\",\"content_column_breakpoint\":\"m\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link_style\":\"\",\"link_text\":\"Read more\",\"margin\":\"small\",\"maxwidth\":\"large\",\"meta\":\"Comprehensive PPP advisory covering concept design, feasibility study, and tender preparation for urban park revitalization.\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"\",\"text_align\":\"left\",\"title\":\"Trostyanets Municipal Park Reconstruction\",\"title_align\":\"top\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\\\/uploads\\\/ignacio-brosa-vJDbPuxUS_s-unsplash.jpg\",\"image_svg_color\":\"emphasis\",\"image_width\":\"920\",\"link\":\"index.php?page_id=29\",\"margin\":\"default\"}}]}]},{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"margin\":\"large\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"block_align\":\"center\",\"content\":\"14\",\"margin\":\"remove-vertical\",\"margin_remove_bottom\":false,\"maxwidth\":\"large\",\"title_color\":\"muted\",\"title_element\":\"h1\",\"title_style\":\"heading-large\"}},{\"type\":\"panel\",\"props\":{\"block_align\":\"center\",\"content\":\"\n\n<div class=\\\"uk-flex uk-flex-wrap uk-flex-left uk-margin-small-bottom uk-labels\\\" style=\\\"gap:6px;\\\">\\n  <span class=\\\"uk-label uk-label-primary\\n\\\">PPP<\\\/span>\\n  <span class=\\\"uk-label uk-label-blue\\\">PM<\\\/span>\\n  <span class=\\\"uk-label uk-label-light\\\">Municipal<\\\/span>\\n<\\\/div>\",\"content_column_breakpoint\":\"m\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link_style\":\"\",\"link_text\":\"Read more\",\"margin\":\"small\",\"maxwidth\":\"large\",\"meta\":\"Full-cycle PPP advisory, including concept development, feasibility study, financial modeling, and preparation of tender documentation for municipal service modernization.\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"\",\"text_align\":\"left\",\"title\":\"Zhytomyr Municipal Laundry Service\",\"title_align\":\"top\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\\\/uploads\\\/oli-woodman-f4jsI88K7ds-unsplash.jpg\",\"image_svg_color\":\"emphasis\",\"image_width\":\"920\",\"link\":\"index.php?page_id=29\",\"margin\":\"default\"}}]}]}]}],\"version\":\"4.5.28\"} --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Our Projects Selected projects supported by SPILNO showcasing our role in structuring, coordinating, and implementing Ukraine\u2019s leading public investment and PPP initiatives. 01 Olvia Sea Port Project management, stakeholder coordination, legal and financial advisory to the Ministry of Infrastructure and investors Concession PM Central Gov. Read more 02 Kherson Sea Commercial Port Full-cycle transaction advisory: [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":11,"comment_status":"closed","ping_status":"closed","template":"","meta":{"inline_featured_image":false,"footnotes":""},"class_list":["post-22","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.spilno.in.ua\/index.php?rest_route=\/wp\/v2\/pages\/22","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.spilno.in.ua\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.spilno.in.ua\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.spilno.in.ua\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.spilno.in.ua\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=22"}],"version-history":[{"count":98,"href":"https:\/\/www.spilno.in.ua\/index.php?rest_route=\/wp\/v2\/pages\/22\/revisions"}],"predecessor-version":[{"id":2465,"href":"https:\/\/www.spilno.in.ua\/index.php?rest_route=\/wp\/v2\/pages\/22\/revisions\/2465"}],"wp:attachment":[{"href":"https:\/\/www.spilno.in.ua\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=22"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}